Competency Profile Chart (CPC)
Memaparkan 1,421-1,440 daripada 12,602 items.
| Bil | Competency | Tajuk Competency Unit (CU) | Lihat Terperinci |
|---|---|---|---|
| 1421 | Core | HEATING, VENTILATION AND AIR CONDITIONING (HVAC) AND REFRIGERATION SYSTEM MAINTENANCE | Job Description (JD) |
| 1422 | Core | MATERIAL HANDLING EQUIPMENT MAINTENANCE | Job Description (JD) |
| 1423 | Core | MECHANICAL TRANSMISSION SYSTEM TROUBLESHOOTING AND OVERHAUL | Job Description (JD) |
| 1424 | Core | ROTATING EQUIPMENT TROUBLESHOOTING AND OVERHAUL | Job Description (JD) |
| 1425 | Core | STATIC EQUIPMENT TROUBLESHOOTING AND OVERHAUL | Job Description (JD) |
| 1426 | Core | MACHINERY PARTS INVENTORY CONTROL | Job Description (JD) |
| 1427 | Core | MECHANICAL MAINTENANCE SUPERVISION | Job Description (JD) |
| 1428 | Core | FASHION AND DESIGN MARKET ANALYSIS | Job Description (JD) |
| 1429 | Core | BATIK DESIGN RESEARCH & DEVELOPMENT | Job Description (JD) |
| 1430 | Core | BATIK DESIGN MAKING | Job Description (JD) |
| 1431 | Core | BATIK PROTOTYPE PRODUCTION | Job Description (JD) |
| 1432 | Core | BATIK DESIGN PRODUCTION SUPERVISION | Job Description (JD) |
| 1433 | Core | BATIK DESIGN PRODUCTION INVENTORY CONTROL | Job Description (JD) |
| 1434 | Elektif | BATIK DESIGN TOOLS AND TECHNOLOGY APPLICATION | Job Description (JD) |
| 1435 | Core | CERAMIC CRAFT PRODUCT PLANNING | Job Description (JD) |
| 1436 | Core | CERAMIC CRAFT PROCUREMENT CONTROL | Job Description (JD) |
| 1437 | Core | CERAMIC CRAFT PRODUCTION ADMINISTRATION | Job Description (JD) |
| 1438 | Core | CERAMIC CRAFTPROTOTYPE DESIGNAND DEVELOPMENT | Job Description (JD) |
| 1439 | Core | CERAMIC CRAFT QUALITY CONTROL ADMINISTRATION | Job Description (JD) |
| 1440 | Core | PROJECT INITIATION | Job Description (JD) |

