Competency Profile Chart (CPC)
Memaparkan 10,521-10,540 daripada 12,640 items.
| Bil | Competency | Tajuk Competency Unit (CU) | Lihat Terperinci |
|---|---|---|---|
| 10521 | Core | PENYELENG-GARAAN SISTEM PENDORONG VESEL PENANGKAPAN IKAN | Job Description (JD) |
| 10522 | Core | PENYELENG-GARAAN SISTEM KEMUDI VESEL PENANGKAPAN IKAN | Job Description (JD) |
| 10523 | Core | PENYELENG-GARAAN ENJIN VESEL PENANGKAPAN IKAN | Job Description (JD) |
| 10524 | Core | PENYELENG-GARAAN PERALATAN GELADAK (DECK) VESEL PENANGKAPAN IKAN | Job Description (JD) |
| 10525 | Core | PENYELENG-GARAAN SISTEM REFRIGERATED SEAWATER VESEL PENANGKAPAN IKAN | Job Description (JD) |
| 10526 | Core | PENYELENG-GARAAN SISTEM JANA KUASA VESEL PENANGKAPAN IKAN | Job Description (JD) |
| 10527 | Core | PENYELARASAN VESEL PENANGKAPAN IKAN KE GALANGAN | Job Description (JD) |
| 10528 | Core | PENYELENG-GARAAN ENJIN SANGKUT | Job Description (JD) |
| 10529 | Core | WORK LOCATION PREPARATION | Job Description (JD) |
| 10530 | Core | PIPELINE FIT UP | Job Description (JD) |
| 10531 | Core | PIPELINE STRUCTURE ERECTION | Job Description (JD) |
| 10532 | Core | PIPE SUPPORT INSTALLATION | Job Description (JD) |
| 10533 | Core | PIPELINE REPAIR AND REPLACEMENT | Job Description (JD) |
| 10534 | Core | PIPELINE SAFETY COMPLIANCE SUPERVISION | Job Description (JD) |
| 10535 | Core | SITE CONDITION VERIFICATION | Job Description (JD) |
| 10536 | Core | PIPELINE FABRICATION AND INSTALLATION SUPERVISION | Job Description (JD) |
| 10537 | Core | PIPELINE REPAIR AND REPLACEMENT VERIFICATION | Job Description (JD) |
| 10538 | Core | PIPELINE SUPERVISORY FUNCTION | Job Description (JD) |
| 10539 | Core | Industrial Engineering Drawing | Job Description (JD) |
| 10540 | Core | Material Fitting and Joining | Job Description (JD) |

