Competency Profile Chart (CPC)
Memaparkan 7,281-7,300 daripada 12,615 items.
| Bil | Competency | Tajuk Competency Unit (CU) | Lihat Terperinci |
|---|---|---|---|
| 7281 | Core | PRESSURISED EQUIPMENT COMPONENTS ASSEMBLY | Job Description (JD) |
| 7282 | Core | PRODUCT SURFACE FINISHING | Job Description (JD) |
| 7283 | Core | Perform Assignment Administration | Job Description (JD) |
| 7284 | Core | Perform General Audit Administration | Job Description (JD) |
| 7285 | Core | Perform Compliance Test | Job Description (JD) |
| 7286 | Core | Perform Assets Substantive Test | Job Description (JD) |
| 7287 | Core | Perform Liabilities Substantive Test | Job Description (JD) |
| 7288 | Core | Perform Income Statement Substantive Test | Job Description (JD) |
| 7289 | Core | Perform Statutory Records and Capital Substantive Test | Job Description (JD) |
| 7290 | Core | PERFORM SAMPLE PREPARATION ACTIVITIES | Job Description (JD) |
| 7291 | Core | PERFORM STANDARD SOLUTION PREPARATION ACTIVITIES | Job Description (JD) |
| 7292 | Core | PERFORM SAMPLE PHYSICAL TEST ACTIVITIES | Job Description (JD) |
| 7293 | Core | PERFORM SAMPLE CHEMICAL ANALYSIS ACTIVITIES | Job Description (JD) |
| 7294 | Core | MAINTAIN LABORATORY EQUIPMENT AND INSTRUMENT | Job Description (JD) |
| 7295 | Core | ADMINISTER LABORATORY DOCUMENTATION | Job Description (JD) |
| 7296 | Core | ADMINISTER LABORATORY HAZARDOUS MATERIALS | Job Description (JD) |
| 7297 | Core | PLASTICS INJECTION MOULD DESIGN | Job Description (JD) |
| 7298 | Core | PLASTICS INJECTION MOULD FABRICATION PLANNING & CONTROL | Job Description (JD) |
| 7299 | Core | PLASTICS INJECTION MOULD TRIAL RUN AND VALIDATION | Job Description (JD) |
| 7300 | Core | PLASTICS INJECTION MOULD MAINTENANCE | Job Description (JD) |

