Competency Profile Chart (CPC)
Memaparkan 5,381-5,400 daripada 12,607 items.
| Bil | Competency | Tajuk Competency Unit (CU) | Lihat Terperinci |
|---|---|---|---|
| 5381 | Core | QMI CONSTRUCTION SCHEDULE MANAGEMENT | Job Description (JD) |
| 5382 | Core | QMI CONSTRUCTION MANAGEMENT OF CHANGE ADMINISTRATION | Job Description (JD) |
| 5383 | Core | QMI CONSTRUCTION DOCUMENT MANAGEMENT | Job Description (JD) |
| 5384 | Core | QMI CONSTRUCTION PERSONNEL COMPETENCY ASSURANCE | Job Description (JD) |
| 5385 | Core | DATA LOGGER INSTALLATION | Job Description (JD) |
| 5386 | Core | DATA LOGGER COLLECTION | Job Description (JD) |
| 5387 | Core | DISTRIC METERING AREA (DMA) METER READING | Job Description (JD) |
| 5388 | Core | ACTIVE LEAKAGE CONTROL INSPECTION | Job Description (JD) |
| 5389 | Core | NRW COMMERCIAL LOSS VISUAL INSPECTION | Job Description (JD) |
| 5390 | Core | Raw Water Intake System Trouble Shooting | Job Description (JD) |
| 5391 | Core | Pre Chemical Dosing & Coagulant Mixing System Trouble Shooting | Job Description (JD) |
| 5392 | Core | Clarification & Filtration Tank System Trouble Shooting | Job Description (JD) |
| 5393 | Core | Post Chemical Dosing System Trouble Shooting | Job Description (JD) |
| 5394 | Core | Treated WaterPumping System Trouble Shooting | Job Description (JD) |
| 5395 | Core | Sludge Dewatering System Trouble Shooting | Job Description (JD) |
| 5396 | Core | Water Treatment Facility Document Control & Record Keeping | Job Description (JD) |
| 5397 | Core | Water Treatment Facility Supervisory Function | Job Description (JD) |
| 5398 | Core | PERFORM DATA COMPILATION | Job Description (JD) |
| 5399 | Core | PERFORM FIELD DATA COLLECTION | Job Description (JD) |
| 5400 | Core | PERFORM DATA CONVERSION AND COORDINATE TRANSFORMATION | Job Description (JD) |

