Competency Profile Chart (CPC)
Memaparkan 2,701-2,720 daripada 12,602 items.
| Bil | Competency | Tajuk Competency Unit (CU) | Lihat Terperinci |
|---|---|---|---|
| 2701 | Core | WATER METER INSTALLATION AND ACTIVATION | Job Description (JD) |
| 2702 | Core | WATER PIPING INSTALLATION AND CONNECTION | Job Description (JD) |
| 2703 | Core | WATER RESERVOIR MAINTENANCE | Job Description (JD) |
| 2704 | Core | WATER BOOSTER PUMP HOUSE OPERATION | Job Description (JD) |
| 2705 | Core | WATER SYSTEM OPERATION | Job Description (JD) |
| 2706 | Core | WATER ASSET MAINTENANCE WORK | Job Description (JD) |
| 2707 | Core | WATER QUALITY OPERATION | Job Description (JD) |
| 2708 | Core | NON-REVENUE WATER (NRW) DATA COLLECTION | Job Description (JD) |
| 2709 | Core | CARGO OPERATIONHEALTH, SAFETY, ENVIRONMENT & SECURITY IMPLEMENTATION | Job Description (JD) |
| 2710 | Core | CARGO SHIPMENT PLANNING INTEGRATION | Job Description (JD) |
| 2711 | Core | CARGO OPERATION FLOW CONTROL | Job Description (JD) |
| 2712 | Core | CARGO OPERATION PERFORMANCE EVALUATION | Job Description (JD) |
| 2713 | Elektif | DRY BULK CARGO OPERATION CONTROL | Job Description (JD) |
| 2714 | Elektif | BREAK BULK CARGO OPERATION CONTROL | Job Description (JD) |
| 2715 | Elektif | CONTAINERISED CARGO OPERATION CONTROL | Job Description (JD) |
| 2716 | Elektif | LIQUID BULK CARGO OPERATION CONTROL | Job Description (JD) |
| 2717 | Elektif | GAS BULK CARGO OPERATION CONTROL | Job Description (JD) |
| 2718 | Core | INTERIOR ACCESSORIES INSTALLATION | Job Description (JD) |
| 2719 | Core | EXTERIOR ACCESSORIES INSTALLATION | Job Description (JD) |
| 2720 | Core | SUSPENSION SYSTEM UPGRADING | Job Description (JD) |

