Job Description (JD)
| Nama Program | OPERASI DAN PENGURUSAN DANDANG STIM [D353-001-5:2025] |
|---|---|
| Kod CU | D353-001-5:2025-E01 |
| Competency | Elektif |
| Tajuk CU | PERFORM NEW STEAM BOILER SYSTEM DESIGN VERIFICATION |
| Penerangan CU | Perform new steam boiler system design verification describes on verifying steam boiler system designs to ensure compliance with technical, operational, and regulatory requirements. It emphasizes evaluation, cross-checking, and validation activities that support safe and efficient boiler implementation. The person who is competent in this CU should be able to propose new steam boiler requirements, cross-check the new steam boiler design and validate the new steam boiler design report. The outcome of this CU is the ability to verify that steam boiler designs meet performance, safety, and legal expectations thus supporting reliable installation, operational readiness, and long-term system efficiency. |
| Tempoh Latihan | 0 |
| Objektif Pembelajaran | The learning outcomes of this competency are to enable the trainees to verify that steam boiler designs meet performance, safety, and legal expectations thus supporting reliable installation, operational readiness, and long-term system efficiency. Upon completion of this competency unit, trainees should be able to: 1. Propose new steam boiler requirements. 2. Cross check new steam boiler design. 3. Validate new steam boiler design report. |
| Pra-Syarat | Tiada |

