Job Description (JD)
| Nama Program | OPERASI DAN PENGURUSAN DANDANG STIM [D353-001-5:2025] |
|---|---|
| Kod CU | D353-001-5:2025-C06 |
| Competency | Core |
| Tajuk CU | MANAGE NEW STEAM BOILER INSTALLATION |
| Penerangan CU | Manage new steam boiler installation involves overseeing the planning, installation, and commissioning of steam boiler systems initiated by the project or new machinery installation team, ensuring technical compliance, operational readiness, and adherence to regulatory standards. The person who is competent in this CU should be able to support new steam boiler system planning, support new steam boiler construction and installation requirements, control new steam boiler pre-commissioning, control new steam boiler commissioning activities including drying out, boiling out, and steam flushing, and control new steam boiler test performance. The outcome of this CU is the ability to effectively manage the end-to-end installation process of new steam boilers thus ensuring safe execution, proper system validation, and successful integration into operational use, while meeting industry, safety, and performance requirements. |
| Tempoh Latihan | 0 |
| Objektif Pembelajaran | The learning outcomes of this competency are to enable the trainees to effectively manage the end-to-end installation process of new steam boilers thus ensuring safe execution, proper system validation, and successful integration into operational use, while meeting industry, safety, and performance requirements. Upon completion of this competency unit, trainees should be able to: 1. Support new steam boiler system planning. 2. Support new steam boiler construction and installation requirements. 3. Control new steam boiler pre-commissioning. 4. Control new steam boiler commissioning activities (drying out). 5. Control new steam boiler commissioning activities (boiling out). 6. Control new steam boiler commissioning activities (steam flushing). 7. Control new steam boiler test performance. |
| Pra-Syarat | Tiada |

