Nama ProgramPEMASANGAN, PENGUJIAN DAN PENYELENGGARAAN LIF, ESKALATOR DAN LALUAN GERAK [F432-010-2:2025]
Kod CUF432-010-2:2025-C01
CompetencyCore
Tajuk CUPERFORM LIFT INSTALLATION
Penerangan CUPerform Lift Installation describes the activities to prepare, assemble, and align lift components in compliance with industry standards. It covers interpreting technical schematics, site preparation, assembling key components, wiring control systems, alignment, and conducting preliminary testing to ensure safety and functionality.

The person who is competent in this CU should be able to inspect lift shaft, setup installation template, install hoistway components, install landing door and sill, install lift motor, install overspeed governor, install control panel, install car structure, install counterweight frame, install wire rope, install lift wiring and accessories, install lift pit accessories and perform lift installation works housekeeping.

The outcome of this CU is the ability to install entire lift system properly to ensure a wide range of benefit in term of safety, reliability, efficiency and accessibility.
Tempoh Latihan416
Objektif PembelajaranThe learning outcomes of this competency are to enable the trainees to safely install lift components, including the shaft, car, doors, mechanical and electrical systems, while ensuring proper alignment and functionality in accordance with industry standard and safety standard and regulation.

Upon completion of this competency unit, trainees should be able to:
1. Inspect lift shaft.
2. Setup installation template.
3. Install hoistway components.
4. Install landing door and sill.
5. Install lift motor.
6. Install overspeed governor.
7. Install control panel.
8. Install car structure.
9. Install counterweight frame
10. Install wire rope
11. Install lift wiring and accessories
12. Install pit accessories