Penerangan CUPerform three phase air-conditioning and refrigeration air-cooled equipment installation describes the methodology of installing a three-phase air conditioning air-cooled equipment including power & control wiring system, condensation water drainage system, refrigeration system, fittings & accessories, as well as final touch-up of installation in accordance with manufacture’s specification and authority requirements.

The person who is competent in this CU should be able to carry out three phase air-cooled equipment fitting work, install air-cooled mounting bracket plate/ hanging rod, drill piping hole, install air-cooled piping system, install three phase indoor unit, install three phase outdoor unit, install three phase air-cooled equipment wiring system, carry out air-conditioning and refrigeration air-cooled leak test, vacuum refrigerant piping system, charge air-cooled refrigerant, carry out three phase air-cooled equipment testing and record three phase air-conditioning and refrigeration air-cooled equipment installation process.

The outcome of this CU is performance, quality and energy efficiency obtained, Health, Safety and Environment compliance observed in accordance with manufacture’s specification and authority requirements.
Tempoh Latihan480
Objektif PembelajaranThe learning outcomes of this competency are to enable the trainees to obtain quality and energy efficiency and observe Health, Safety and Environment compliance in accordance with manufacture’s specification and authority requirements.

Upon completion of this competency unit, trainees should be able to:
1. Carry out three phase air-cooled equipment fitting work.
2. Install air-cooled mounting bracket plate/ hanging rod.
3. Drill piping hole.
4. Install air-cooled piping system.
5. Install three phase indoor unit.
6. Install three phase outdoor unit.
7. Install three phase air-cooled equipment wiring system.
8. Carry out air-conditioning and refrigeration air-cooled leak test.
9. Vacuum refrigerant piping system.
10. Charge air-cooled refrigerant.
11. Carry out three phase air-cooled equipment testing.
12. Record three phase air-conditioning and refrigeration air-cooled equipment installation process.