Job Description (JD)
Nama Program | PENYELIAAN TAPAK PENCERUCUKAN [BC-062-3:2015] |
---|---|
Kod CU | BC-062-3:2015-C03 |
Competency | Core |
Tajuk CU | PILE TESTING WORK COORDINATION |
Penerangan CU | Pile Testing Work Coordination is the competency to organise an assessment of the condition of piles or shafts in accordance with testing manual and company’s Standard Operating Procedures The person who is competent in this CU shall be able to identify pile testing work requirements, organise Maintained Load Test (MLT), organise Pile Dynamic Analyser (PDA) test, Pile Integrity Test (PIT) and Sonic Logging Test (SLT). The outcome of this competency is the ability to perform load test and pile integrity test in accordance with testing manual and company’s standard operating procedure |
Tempoh Latihan | 400 |
Objektif Pembelajaran | The outcome of this competency is the ability to perform load test and pile integrity test in accordance with testing manual and company’s standard operating procedure. Upon completion of this competency unit, trainees will be able to:- • Identify pile testing work requirements • Organise Maintained Load Test (MLT) • Organise Pile Dynamic Analyser (PDA) test • Organise Pile Integrity Test (PIT) • Organise Sonic Logging Test (SLT) |
Pra-Syarat | 0 |