Job Description (JD)
Nama Program | Operasi Tiupan Acuan Plastik & Penyelenggaraan [MC-102-2:2015] |
---|---|
Kod CU | MC-102-2:2015-C04 |
Competency | Core |
Tajuk CU | BLOW MOULDING PARAMETER SET-UP |
Penerangan CU | The CU title describes the competency in Parameter Set-Up. The person who perform this task do the parameter set-up to the machine before an actual production run. The person who is competent in this CU shall be able to set blow moulding machine parameters, acquire Quality Control (QC) approval and verify final parameter setting. The outcome of this competency is to provide the machine complete with standard parameter so that the production process can proceed smoothly. |
Tempoh Latihan | 200 |
Objektif Pembelajaran | The person who is competent in this competency unit shall be able to provide the machine complete with standard parameter so that the production process can proceed smoothly. Upon completion of this competency unit, trainees will be able to:- • Set blow moulding machine parameter. • Acquire Quality Control (QC) approval. • Verify final parameter setting. |
Pra-Syarat | 0 |