Job Description (JD)
Nama Program | Pembuatan Acuan Suntikan Plastik [MC-030-3:2015] |
---|---|
Kod CU | MC-030-3:2015-C01 |
Competency | Core |
Tajuk CU | PLASTIC INJECTION MOULD FABRICATION COORDINATION |
Penerangan CU | Plastic Injection Mould Fabrication Coordination is an activity of arranging and monitoring plastic injection mould fabrication process which covers multidiscipline manufacturing technique based on assembly, detail drawing and fabrication work schedule. The person who is competent in this CU shall be able to prepare plastic injection mould fabrication requirements, plan fabrication work activities, coordinate machining activities, arrange secondary process, inspect plastic injection mould standard parts and components and prepare plastic injection mould fabrication report. The outcome of this competency is to ensure the plastic injection mould fabrication process is carried out within the stipulate time frame and specified specification completed for mould assembly activity in accordance with work schedule. |
Tempoh Latihan | 300 |
Objektif Pembelajaran | The person who is competent in plastic injection mould fabrication coordination shall be able to ensure the fabrication process is carried out within the stipulate time frame and specified specification completed for plastic injection mould assembly activity in accordance with work schedule. Upon completion of this competency unit, trainees will be able to :- • Prepare plastic injection mould fabrication requirements • Plan fabrication work activities • Coordinate machining activities • Arrange secondary process • Inspect plastic injection mould standard parts and components • Prepare plastic injection mould fabrication report |
Pra-Syarat | 0 |