JOB DESCRIPTION

Job Description (JD)

Nama ProgramOPERASI PENCERUCUKAN [BC-062-2:2015]
Kod CUBC-062-2:2015-C04
CompetencyCore
Tajuk CUDRIVEN PILING OPERATIONS
Penerangan CUDriven Piling Operations is to install precast pile by driven using a piling hammer, which is capable of carrying the load as specified in the construction drawing.

The person who is competent in this CU shall be able to check site location, prepare boring tools, equipment and materials, set up piling machine & execute piling work.

The outcome of this competency is the ability to perform driven piling as specified in the construction drawing and work safety requirements.


Tempoh Latihan200
Objektif PembelajaranThe outcome of this competency is the ability to perform driven piling as specified in the construction drawing and work safety requirements. Upon completion of this competency unit, trainees will be able to:-
• Check site location
• Prepare tools, equipment and materials
• Set up piling machine
• Execute driven piling work
Pra-Syarat0