Job Description (JD)
| Nama Program | FABRIKASI, PEMASANGAN & PENYELENGGARAAN SERIMALA (BESI) [TP-028-2:2014] |
|---|---|
| Kod CU | TP-028-2:2014-C04 |
| Competency | Core |
| Tajuk CU | SHIP HULL SUB-ASSEMBLY CONSTRUCTION |
| Penerangan CU | "Ship hull sub-assembly construction is a unit assembled separately but designed to fit with other units. It is a process of joining and welding of all the steel components. The person who is competent in ship hull sub-assembly construction shall be able to prepare sub-assembly construction requirements, carry out pad eye fabrication, carry out panel and pad eye installation and finalise sub-assembly construction work in accordance with ship hull construction specifications. The outcome of this competency is to ensure that panels and pad eye are assembled and installed according to sub-assembly construction requirements and ship hull construction specifications. " |
| Tempoh Latihan | 100 |
| Objektif Pembelajaran | The outcome of this competency is to ensure that panels and pad eye are assembled and installed according to sub-assembly construction requirements and ship hull construction specifications. Upon completion of this competency unit, trainees will be able to: Prepare ship hull sub-assembly construction requirements Carry out pad eye fabrication Carry out panel and pad eye installation Finalise sub-assembly construction work |
| Pra-Syarat | 0 |

