Job Description (JD)
| Nama Program | Operasi Penggerudian(Minyak, Gas & Petrokimia) [OG-012-3:2011] |
|---|---|
| Kod CU | OG-012-3:2011-C06 |
| Competency | Core |
| Tajuk CU | XMAS TREE INSTALLATION |
| Penerangan CU | Xmas Tree Installation is a process to install control valves, pressure gauges, and chokes assembled at the top of a well to control the flow of oil and gas after the well has been drilled and completed. |
| Tempoh Latihan | 192 |
| Objektif Pembelajaran | 0 |
| Pra-Syarat | 0 |

