Job Description (JD)
| Nama Program | Operasi Penggerudian(Minyak, Gas & Petrokimia) [OG-012-3:2011] |
|---|---|
| Kod CU | OG-012-3:2011-C01 |
| Competency | Core |
| Tajuk CU | NIPPLE UP BLOWOUT PREVENTER (BOP) INSTALLATION |
| Penerangan CU | Nipple up Blowout Preventer (BOP) installation is a process of assembling wellcontrol or pressurecontrol equipment on the wellhead. The installation of BOP is to put together, connect parts and plumbing, or otherwise make ready for use. |
| Tempoh Latihan | 726 |
| Objektif Pembelajaran | 0 |
| Pra-Syarat | 0 |

