Job Description (JD)
Nama Program | Koordinasi & Pentadbiran Pembuatan Superstruktur dan Serimala Gentian Kaca [TP-022-4:2016] |
---|---|
Kod CU | TP-022-4:2016-C02 |
Competency | Core |
Tajuk CU | FIBREGLASS HULL MANUFACTURING PLANNING AND CONTROL |
Penerangan CU | Fibreglass hull product manufacturing is a process to plan, monitor and control accuracy of fibreglass boat hull fabrication according to design specification and requirements. The person who is competent in fibreglass hull product manufacturing shall be able to analyse hull building requirements, organise hull raw material, tools & equipment’s preparation activities, monitor and control hull gel coating activities, hull and hull skin lamination activities, double mould hull assembly, hull reinforcement activities, hull de-moulding activities and hull trimming and touch-up activities in accordance with fibreglass boat specifications. The outcome of this competency is the ability to confirm hull production tools and materials prepared perfectly, manufacture fibreglass boat hull accordingly follow process sequence and excellent quality that fulfil excellent product quality in accordance with fibreglass boat specifications and requirements. Skin coat activities in fiberglass hull manufacturing are optional. This process basically cover in a big company and not applicable for small company. Boat categories for small craft are below 24 meters. After completion of this process, fiberglass hull transfer to assembly line to proceed required attachment and components on panels. |
Tempoh Latihan | 400 |
Objektif Pembelajaran | The person who is competent in this competency unit shall be able to confirm hull production tools and materials prepared perfectly, manufacture fibreglass boat hull accordingly follow process sequence and excellent quality that fulfil excellent product quality in accordance with fibreglass boat specifications and requirements. Upon completion of this competency unit, trainees will be able to:- • Plan fibreglass hull manufacturing works • Control hull gel coating activities • Confirm hull skin coat quality • Confirm hull lamination quality • Control double mould hull assembly activities • Control hull reinforcement activities • Control hull de-moulding activities • Verify fibreglass hull trimming and touch up quality |
Pra-Syarat | 0 |