JOB DESCRIPTION

Job Description (JD)

Nama ProgramPre Stressing [BC-043-3:2014]
Kod CUBC-043-3:2014-C05
CompetencyCore
Tajuk CUPRE TENSION STRESSING
Penerangan CUPre tension stressing is a process of tensioning the cables. Compared to post tension, pre tension cables are tensioned before casting of concrete. The personnel involved in stressing the tendons anchored at both ends before the concrete casting.

The person who is competent in this CU shall be able to organise pre tension stressing work preparation, organise stressing equipment, perform stressing works and perform load transfer activities in accordance with Lembaga Pembangunan Industri Pembinaan Malaysia Act 1994 (Act 520) and Occupational Safety and Health Act (OSHA).

The outcome of this competency is to develop skill personnel in pre tension stressing works.
Tempoh Latihan480
Objektif PembelajaranThe person who is competent in this CU shall be able to ensure the tendons are properly stressed according to the predetermined strand stressing length. Upon completion of this competency unit, trainees will be able to: -
• Organise pre tension stressing work preparation
• Organise stressing equipment
• Perform stressing work
• Perform load transfer activities
Pra-Syarat0