JOB DESCRIPTION

Job Description (JD)

Nama ProgramPEMASANG SISTEM SALIRAN (LONGKANG) [F422-004-1:2021]
Kod CUF422-004-1:2021-C02
CompetencyCore
Tajuk CUDRAIN INSTALLATION SITE PREPARATION
Penerangan CUDrain Installation Site Preparation describes required competencies carrying out preparation activities prior to drain installation work.

The person who is competent in this CU should be able to identify material usage requirement, carry out material requisition, carry out material allocation and storage, carry out setting out activities and carry out excavation works.

The outcome of this CU is the setting out work measured and marked accurately according to drawing and specification requirements.
Tempoh Latihan0
Objektif PembelajaranThe learning outcomes of this competency are to enable the trainees to carry out setting out work activities including measuring and marking according to construction drawing and specification requirements.

Upon completion of this competency unit, trainees should be able to:
1. Identify material usage requirement.
2. Carry out material requisition.
3. Carry out material allocation and storage.
4. Carry out setting out activities.
5. Carry out excavation works.
Pra-SyaratNot Available.