JOB DESCRIPTION

Job Description (JD)

Nama ProgramPengurusan Fesyen dan Pakaian [TA-011-5:2013]
Kod CUTA-011-5:2013-E01
CompetencyElektif
Tajuk CUAPPAREL PRODUCTION TIME AND MOTION STUDY
Penerangan CUApparel production time and motion study is a business efficiency techniques combining The Time Study work of Frederick Winslow with the Motion Study work of Frank and Lillian Gilbreath. It is a major part of scientific management. Time study developed in the direction of establishing standard times, while motion study involved into a techniques for improving work methods. The two techniques became integrated and refined into a widely accepted method applicable to the improvement and upgrading of work systems. This integrated approach to work system improvement is known as methods engineering and it is applied today to industrial as well as service organizations. The person who is competent in this CU shall be able to plan and perform time and motion study activities in accordance with company requirements. The outcome of this competency is to provide production planner in achieving rational and reasonable result by conducting actual timing, improving work procedure and defining standard time in accordance with specific method.
Tempoh Latihan120
Objektif PembelajaranThe person who is competent in this CU shall be able to perform apparel production time and motion study to meet customer specifications. Upon completion of this competency unit, trainees will be able to:-
• Analyse apparel production time and motion study requirements
• Plan apparel production time and motion study activities
• Perform apparel production time and motion study activities
• Assess apparel production time and motion study result
Pra-Syarat0