JOB DESCRIPTION

Job Description (JD)

Nama ProgramOPERASI PENYELENGGARAAN PESAWAT DAN PERSIJILAN [TP-060-5:2013]
Kod CUTP-060-5:2013-C05
CompetencyCore
Tajuk CUAircraft Power Plant System Maintenance
Penerangan CUThe Competency Unit (CU) of Aircraft power plant system maintenance is developed based on Air Transport Association (ATA) System Chapter 100.

The relevant chapters under ATA 100 are the following:

- Chapter 49 (Airborne auxiliary power)
- Chapter 71 (Power plant)
- Chapter 72(T) (Engine (Turbine))
- Chapter 73 (Engine fuel & control)
- Chapter 74 (Ignition )
- Chapter 75 (Bleed Air)
- Chapter 76 (Engine control)
- Chapter 77 (Engine indicating)
- Chapter 78 (Exhaust)
- Chapter 79 (Oil)
- Chapter 80 (Starting)
- Chapter 81 (Turbines [Reciprocating Engines])
- Chapter 82 (Engine Water Injection)
- Chapter 83 Accessory Gearboxes)
- Chapter 84 (Propulsion Augmentation)

Aircraft power plant system maintenance is to maintain aircraft power plant system in accordance with the requirement of the Original Equipment Manufacturer (OEM), Department of Civil Aviation Malaysia (DCAM) and other regulatory bodies.

The personnel who are competent in aircraft power plant system maintenance shall be able to identify, plan, inspect, troubleshoot, repair, replace, modify, test, overhaul, record and certify power plant systems to meet continuous airworthiness standards.

The outcome of this competency is to develop competent manpower in accordance with company’s Standard Operating Procedures (SOP) and job description.
Tempoh Latihan400
Objektif PembelajaranAircraft power plant maintenance is to maintain aircraft power plant system in accordance with the requirement of the Original Equipment Manufacturer (OEM), Department of Civil Aviation Malaysia (DCAM) and other regulatory bodies. The personnel who are competent in aircraft power plant maintenance shall be able to:-

• Study the principle and theory of aircraft power plant maintenance
• Identify aircraft power plant system components
• Plan aircraft power plant system maintenance activities
• Inspect aircraft power plant system component
• Replace aircraft power plant system component
• Test aircraft power plant system component
• Repair aircraft power plant system component
• Troubleshoot aircraft power plant system component
• Modify aircraft power plant system component
• Overhaul aircraft power plant system
• Record aircraft power plant maintenance activities
Pra-Syarat0