JOB DESCRIPTION

Job Description (JD)

Nama ProgramOperasi Pengeluaran (Pesisiran Pantai) [OG-021-1:2013]
Kod CUOG-021-1:2013-C07
CompetencyCore
Tajuk CUUTILITIES SYSTEM PRE MAINTENANCE INSPECTION
Penerangan CUUtilities system pre maintenance preparation. Before the maintenance of Utilities equipment all spare parts required for the work scope must be available at the worksite or location. All special tools and test equipment required for the work scope must be available at the worksite or location.
All related plans, drawing and reference book/ manual must be available at the worksite or location

The person who is competent is this CU should be able to identify utilities system pre/post maintenance preparation requirements, perform utilities system pre-maintenance preparation and perform utilities system post-maintenance preparation.

The outcome of this competency is to ensure all interdependent utilities equipment/system are available and brings onto line systems or equipment.

The personnel who will be competent in this competency must in prior have the following competencies:-
- Personnel, Equipments & Workplaces Safety, Health & Environment Assurances


Tempoh Latihan60
Objektif PembelajaranThe trainee who is competent in this CU shall be able to arrange preparation of utilities system according to company standard operating procedure to ensure efficiency of equipment at all times. Upon completion of this competency unit, trainees will be able to Identify utilities system maintenance preparation requirement Perform utilities system maintenance preparation
Pra-Syarat0