JOB DESCRIPTION

Job Description (JD)

Nama ProgramPenyelenggaraan Elektrik(Pesisiran Pantai)(Minyak, Gas & Petrokimia) [OG-019-1:2013]
Kod CUOG-019-1:2013-C02
CompetencyCore
Tajuk CUEQUIPMENT & CABLE INSTALLATION AND TESTING
Penerangan CUEquipment, MCC and cable are the main components which complete the circuit in any electrical system. The cable is used as a link to deliver the electrical power supply from the MCC to the equipment. When this system is installed then the equipment is tested to its required operational function.
The person who is competent in this CU shall be able to determine installation and testing requirements, check and verify equipment and cable specifications received, install equipment and cable, perform continuity and installation test, submit report and test result
The outcome of this competency is to install equipment and cable according to requirements and company standard operating procedure
The personnel who will be competent in this competency must in prior have the following competencies:-
QHSE requirements compliance
Tempoh Latihan90
Objektif PembelajaranThe trainee who is competent in this CU shall be able to repair, service and upkeep electrical heating system equipment electrical system according to company standard operating procedure to ensure efficiency of equipment at all times. Upon completion of this competency unit, trainees will be able to :-
1. Identify electrical heating system equipment maintenance requirements
2. Perform electrical heating system functionality check
3. Report maintenance activities and findings
Pra-SyaratTIADA