JOB DESCRIPTION

Job Description (JD)

Nama ProgramKoordinasi Pembinaan Serimala [TP-024-4:2012]
Kod CUTP-024-4:2012-C02
CompetencyCore
Tajuk CUSHIP HULL CONSTRUCTION DRAWING MODIFICATION
Penerangan CUA hull is the watertight body of a ship or boat. Above the hull are the superstructure and/or deckhouse. The line where the hull meets the water surface is called the waterline. The structure of the hull varies depending on the vessel type. In a typical modern steel ship, the structure consists of watertight and non-tight decks, major transverse and longitudinal members called watertight (and also sometimes called non-tight) bulkheads, intermediate members such as girders, stringers and webs, and minor members called ordinary transverse frames, frames, or longitudinal. Hence, this CU specifically develops to produce Hull construction drawings, which include the entire structure of the hull as described above.
The person who is competent in this CU shall be able to Identify ship hull construction design requirements and produce ship hull construction drawings.

The outcome of this competency is to ensure a seamless integration of a ship hull drawings are produced in accordance with naval architectural design and other relevant maritime standards.
Tempoh Latihan180
Objektif PembelajaranThe outcome of this competency is to ensure a ship hull construction drawings are produced in accordance with naval
architectural design and other relevant maritime standards.
Upon completion of this unit, trainees will able to :-
Identify ship hull construction design requirements
Produce ship hull construction drawing
Pra-Syarat0