JOB DESCRIPTION

Job Description (JD)

Nama ProgramPENYELIAAN PEMASANGAN RETIKULASI AIR [F432-004-3:2018]
Kod CUF432-004-3:2018-C02
CompetencyCore
Tajuk CUWater Reticulation Work Inspection
Penerangan CUWater reticulation work inspection
describes the competency in
performing inspection on water
reticulation pipe work
A competent person in this CU shall
be able to verify pipe handling work,
verify pipe laying work, verify valve
installation, verify pipe specials
installation, verify fire hydrant
installation, verify water reticulation
connection, verify chamber
installation and construction, verify
thrust and anchor block construction,
verify marker post, verify flow meter
installation and verify testing result
The outcome of this competency is to
The outcome of this competency is to
ensure that all works are in
compliance with Occupational Safety
And Health Act (OSHA)
requirement, Standard Operating
Procedure (SOP) and Uniform Technical Guideline (UTG)
Tempoh Latihan168
Objektif PembelajaranThe person who is competent in this CU shall be able to ensure that all works are in compliance with
Occupational Safety And Health Act (OSHA) requirement, Standard Operating Procedure (SOP) and
Uniform Technical Guideline (UTG). Upon completion of this competency units, trainees will be able to:-
1. Verify pipe handling work
2. Verify pipe laying and jointing work
3. Verify valve installation
4. Verify pipe specials installation
5. Verify fire hydrant installation
6. Verify water reticulation connection
7. Verify chamber installation and construction
8. Verify thrust and anchor block construction
9. Verify marker post
10. Verify flow meter installation
11. Verify pipe testing result
Pra-Syarat0