JOB DESCRIPTION

Job Description (JD)

Nama ProgramOperasi Penggerudian(Minyak, Gas & Petrokimia) [OG-012-3:2011]
Kod CUOG-012-3:2011-C06
CompetencyCore
Tajuk CUXMAS TREE INSTALLATION
Penerangan CUXmas Tree Installation is a process to install control valves, pressure gauges, and chokes assembled at the top of a well to control the flow of oil and gas after the well has been drilled and completed.
Tempoh Latihan192
Objektif Pembelajaran0
Pra-Syarat0